If you stick a shovel into a gas or electric line your day is going to get a lot more.
Building a concrete shed base on a slope.
This may still require a drainage ditch but probably won t need a.
Use 8 inch blocks for a steeper slope.
Balance the cut and fill by using the soil dug out of the slope to build up the platform for the shed.
When building a shed on unlevel ground as the foundation grade becomes steeper the problem becomes greater.
You build a wood form over a compacted gravel base then place the concrete and finish the surface so it s level with the top of the form.
An 8 x12 shed would use 6 piers 3 per long side.
Before the concrete hardens in the piers set pier or post ties and align in place.
For that reason we decided that building a post and beam foundation would be the best way to go.
Last week i had the opportunity to help a friend build the foundation for a new shed that will be delivered in a couple of weeks.
Plan to set one concrete block pier at each corner of the shed in the middle of each wall and in the very center of the shed.
The second way is to build on the slope.
How to build a level shed base with a retaining wall.
Combine 2 4 and 8 inch thick blocks to get the proper height.
The layout of your yard can make or break your shed foundation and shed for that matter.
Select the site for your gravel shed foundation 1.
Determine the angle of the slope.
Dig out about 18 inches of the existing soil and set this material aside to use for later.
Shed dimensions determine the number of piers you need.
His back yard has a bit of a slope and it would take too much concrete to pour a slab read how to pour a concrete shed foundation here.
If you only need to build a shed base on a slight slope this can be achieved by cutting into the slope slightly on one side and building up the crushed stone on the other.
Laying a concrete block foundation for a shed 1.
Start with 4 inch high blocks at the top if the slope is gentle.
Start by digging out the soil to create a flat surface.
You may need to build a retaining wall to keep the soil from.
Dig into the slope to make a level base for your shed.
Once the piers have cured beams can be set in place on the piers or pier and post and leveled with shims.
Install 18 inches of crushed rock or a 3 4 inch crushed gravel for the sub base.
There are two main solutions to building a shed foundation on a slope.